wheelbrw

Wedgewood Swim Club
Facilities

Click here for a brief Wedgewood Swim Club History

Main Pool

Main PoolThe main pool is the original pool at the Wedgewood Swim Club. It is an "L" shaped pool and measures 75' x 36' with a diving area of 30' x 25'. The depth goes from 3' to 10'. The pool holds 133,000 gallons of water.


Lower Pool

Lower PoolThe Lower Pool, also known as the Lap Pool, is the newest pool at Wedgewood Swim Club. It is a standard 25 meters lap pool with six lanes. The pool measures 82' (25 meters) x 44'. The depth goes from 4' to 5'. The pool holds 124,000 gallons or water.


Baby Pool

Baby PoolThe Baby Pool is 38' x 30' with water depths ranging from 9 inches to 1 foot 8 inches. It is conveniently located next to the pavilion and picnic area to provide easy visibility.


Bathroom and Shower Facilities

BathhouseRebuilt in 1998, the bathrooms and shower facilities include a family / handicapped bathroom and shower.


Picnic Area and Pavilion

Picnic AreaPavilionA large picnic area with picnic tables and charcoal grills is located near the pools. Next to the picnic area is a covered pavilion and the new Deck.

DeckUnbrellas


Back to Top of Page

Wedgewood History

Thanks to Ed Reilly for providing the History of Wedgewood.

Upper original steel pool totally reconstructed with concrete. Pump house equipment replaced.  Concrete around pool replaced along with perimeter drains.  2200 square feet of sod installed.  New fence around pool installed.

For the 2006 summer season, the changes since last season were:
• Installed a new chair rack
• Moved the miniature golf and added another hole for the kids
• Added a fence to the front gate
• Installed a new computer system for member check-in
• Moved all the grills to the perimeter of the picnic area for
additional child safety
• Purchased a new volleyball net, which can be installed within minutes
between the poles on the basketball court

Other changes were also implemented as a result from the survey conducted
over the winter. We hope you are satisfied with the changes and the overall
cleanliness of the facilities.

In January, several trees were trimmed in the picnic area and the parking lot; limbs were getting to be a safety concern.  Bathhouse was completely repainted and the floor were power washed to remove the loose epoxy.. Other projects included adding an amplifier and speakers for our intercom system, and some extra landscaping in several areas.  The baby pool and gutters on the upper pool received a fresh coat of paint before opening day. The storage area for chairs was improved, adding another rack and moving existing racks to allow more room. In addition a new Terrace/Pavers step was installed to replace the old wood steps. These projects were completed by members to save the club labor costs.

Several projects are being planned, the biggest includes refurbishing the floors in the restrooms and breezeway, as well as installing a larger window in the Manager’s office for an improved view of the upper pools, and implementing a recycling program.

Back to Top of Page

Click here for a Non-Frames version.

Activities - By-Laws - Contact WWSC - Directions - Dues - Facilities - General Information - History - Home - Job Opportunities - Links - Membership Application - Membership Information - News - Pictures - Rules - Schedule - Search - Staff - Swimming Lessons - Swim Team - Terminating Membership - Upcoming Events

© 2005 Wedgewood Swim Club. This page was last updated on March 4, 2005.
For comments or questions, contact the Webmaster at: mail@wedgewoodclub.com.