First recorded meeting to organize the club.
Contract made with Sapphire Pools to build a 25 yd. "L" shaped pool, a baby pool, office and breezeway for $29,789.00
Property deed signed - land purchased from Cecil C. Goodwin
Membership - 66 families.
Bath house constructed by the members - one beer can from the wall still remains.
Pool officially opened. First fence was made of turkey wire.
First annual meeting held at Westtown Thornbury School.
Balance sheet dated September 25, noted a deficit of $122.
Balance sheet = $2918.49. Guest fees set at $1 for adults and $.50 for children.
Application for swimming pool operation approved with permit #2132.
Driveway and parking circle completed for $1513.00.
Storage garage constructed by W. Earl Thomas for $2522.00.
Swim team had 51 members. Season record: 1 win, 5 losses.
Agnes Chesco spent the outlandish sum of $23.30 on the swim team party.
Douglas R. Bickley resigns from club. He held bond # 1.
Pavilion constructed.
New grills installed.
Lower pool constructed by Vincent Pools with grading by Bill Hickman for $125,000.00.
New baby pool installed by Carlton Pools
New bathhouse constructed under the direction of project coordinators Steve Schultheis and Dennis Inverso
Construction of steps to lower pool and the addition of benches and umbrellas.
Deck area and ramp to lower pool constructed under the direction of project coordinators Steve Schultheis and Dennis Inverso
Upper original steel pool totally reconstructed with concrete. Pump house equipment replaced. Concrete around pool replaced along with perimeter drains. 2200 square feet of sod installed. New fence around pool installed.
For the 2006 summer season, the changes since last season were:
• Installed a new chair rack
• Moved the miniature golf and added another hole for the kids
• Added a fence to the front gate
• Installed a new computer system for member check-in
• Moved all the grills to the perimeter of the picnic area for
additional child safety
• Purchased a new volleyball net, which can be installed within minutes
between the poles on the basketball courtOther changes were also implemented as a result from the survey conducted
over the winter. We hope you are satisfied with the changes and the overall
cleanliness of the facilities.
In January, several trees were trimmed in the picnic area and the parking lot; limbs were getting to be a safety concern. Bathhouse was completely repainted and the floor were power washed to remove the loose epoxy.. Other projects included adding an amplifier and speakers for our intercom system, and some extra landscaping in several areas. The baby pool and gutters on the upper pool received a fresh coat of paint before opening day. The storage area for chairs was improved, adding another rack and moving existing racks to allow more room. In addition a new Terrace/Pavers step was installed to replace the old wood steps. These projects were completed by members to save the club labor costs.
.
Back to Top of PageSeveral projects are being planned, the biggest includes refurbishing the floors in the restrooms and breezeway, as well as installing a larger window in the Manager’s office for an improved view of the upper pools, and implementing a recycling program.
Click here for a Non-Frames version.
Activities - By-Laws - Contact WWSC - Directions - Dues - Facilities - General Information - History - Home - Job Opportunities - Links - Membership Application - Membership Information - News - Pictures - Rules - Schedule - Search - Staff - Swimming Lessons - Swim Team - Terminating Membership - Upcoming Events© 2005 Wedgewood Swim Club. This page was last updated on March 4, 2005.